![]() |
[Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback] | |
Statutory Instruments of the Scottish Parliament |
||
You are here: BAILII >> Databases >> Statutory Instruments of the Scottish Parliament >> The Electricity (Applications for Consent) Amendment (Scotland) Regulations 2006 No. 18 URL: http://www.bailii.org/scot/legis/num_reg/2006/20060018.html |
[New search] [Help]
Made | 16th January 2006 | ||
Laid before the Scottish Parliament | 20th January 2006 | ||
Coming into force | 13th March 2006 |
Subject matter of application for consent | Fee |
1.
Overhead line with a total distance not exceeding 15 km which is not an EIA Development |
£150.00 |
2.
Overhead line with a total distance not exceeding 15 km which is an EIA Development |
£2,000.00 |
3.
Overhead line with a total distance– |
|
(a) exceeding 15 km but not exceeding 50 km |
£15,000.00 |
(b) exceeding 50 km but not exceeding 100 km |
£25,000.00 |
(c) exceeding 100 km |
£50,000.00 |
4.
Construction or construction and operation of a generating station of megawatt capacity– |
|
(a) not exceeding 10 |
£5,000.00 |
(b) exceeding 10 but not exceeding 100 |
£15,000.00 |
(c) exceeding 100 but not exceeding 200 |
£20,000.00 |
(d) exceeding 200 but not exceeding 500 |
£30,000.00 |
(e) exceeding 500 |
£50,000.00 |
5.
Extension or extension and operation of a generating station resulting in increase in megawatt capacity– |
|
(a) not exceeding 10 |
£5,000.00 |
(b) exceeding 10 but not exceeding 100 |
£15,000.00 |
(c) exceeding 100 but not exceeding 200 |
£20,000.00 |
(d) exceeding 200 but not exceeding 500 |
£30,000.00 |
(e) exceeding 500 |
£50,000.00 |
6.
Extension of a nuclear generating station by retrofitting of emission control equipment |
£5,000.00 |
7.
Any other extension of a generating station |
£1,000.00 |
8.
Operation only or change to manner of operation of a generating station |
£1,000.00 |
ALLAN WILSON
Authorised to sign by the Scottish Ministers
St Andrew's House, Edinburgh
16th January 2006
Subject matter | Previous fee under the principal Regulations as amended | Amended fee |
Construction or construction and operation of a generating station with a capacity not exceeding 10 megawatts | £15,000.00 | £5,000.00 |
Extension or extension and operation of a generating station resulting in increase in megawatt capacity not exceeding 10 megawatts | £15,000.00 | £5,000.00 |
[2] S.I. 1990/455, amended by S.S.I. 2005/295.back
[3] The current Table was substituted by S.S.I. 2005/295.back