You are here: BAILII >> Databases >> England and Wales High Court (Administrative Court) Decisions >> Clientearth, R (on the application of) v Secretary of State for Business, Energy and Industrial Strategy & Anor [2020] EWHC 1303 (Admin) (22 May 2020) URL: http://www.bailii.org/ew/cases/EWHC/Admin/2020/1303.html Cite as: [2020] EWHC 1303 (Admin), [2020] PTSR 1709 |
[New search] [Printable PDF version] [Help]
QUEEN'S BENCH DIVISION
PLANNING COURT
Strand, London, WC2A 2LL |
||
B e f o r e :
____________________
The Queen on the application of ClientEarth |
Claimant |
|
- and - |
||
Secretary of State for Business, Energy and Industrial Strategy |
Defendant |
|
-and- |
||
Drax Power Ltd |
Interested Party |
____________________
Mr Andrew Tait QC and Mr Ned Westaway (instructed by Government Legal Department) for the Defendant
Mr James Strachan QC and Mr Mark Westmoreland Smith (instructed by Pinsent Masons LLP) for the Interested Party
Hearing dates: 28th – 30th April 2020
____________________
Crown Copyright ©
Mr Justice Holgate :
Introduction
The development
Need for the development
Climate change and GHG emissions
An overview of the conclusions of the Panel and the Secretary of State
"…The Secretary of State considers that the Development would be in accordance with the relevant NPSs and, given the national need for such development as set out in the relevant NPSs, the Secretary of State does not believe that its benefits are outweighed by the Development's potential adverse impacts, as mitigated by the proposed terms of the Order. As such, the Secretary of State has decided to make the Order granting development consent …..."
Ground 1: The Defendant misinterpreted the NPS EN-1 on the assessment of the "need" for the Development.
Ground 2: The Defendant failed to give adequate reasons for her assessment of the "need" for the Development.
Ground 3: The Defendant misinterpreted NPS EN-1 on the assessment of GHG emissions.
Ground 4: The Defendant misinterpreted and misapplied section 104(7) of the Planning Act 2008.
Ground 5: The Defendant failed to assess the carbon-capture readiness of the Development correctly in accordance with EN-1.
Ground 6: The Defendant failed to comply with the requirements of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.
Ground 7: The Defendant's consideration of the net zero target was procedurally unfair and, or in the alternative, the Defendant failed to give adequate reasons for her consideration of the net zero target.
Ground 8: The Defendant failed to fully consider the net zero target, including whether to impose a time-limiting condition on the Development.
Ground 9: The Decision was irrational.
The Planning Act 2008 | 26 - 52 |
The National Policy Statements on energy infrastructure | 53 - 97 |
General Legal Principles | 98 - 166 |
Grounds 1 and 2 | 117 - 153 |
Ground 3 | 154 - 173 |
Ground 4 | 14 - 181 |
Ground 5 | 182 - 197 |
Ground 6 | 198 - 221 |
Ground 7 | 222–-252 |
Ground 8 | 253 - 260 |
Ground 9 | 261 |
Conclusion | 262 |
The Planning Act 2008
The White Paper: Planning for a Sustainable Future
"would integrate the Government's objectives for infrastructure capacity and development with its wider economic, environmental and social policy objectives, including climate change goals and targets, in order to deliver sustainable development."
"where government policy is primarily providing a framework for private sector investment determined by the market, policy statements are likely to be less prescriptive."
Likewise, paragraph 3.9 recognised that in the energy sector:-
"the precise energy mix, and therefore the nature of infrastructure needed to meet demand, is determined to a large extent by the market."
"There should therefore be no need for inquiries on individual applications for development consent to cover issues such as whether there is a case for infrastructure development, what that case is, or the sorts of development most likely to meet the need for additional capacity, since this will already have been addressed in the national policy statement. It would of course be open to anyone to draw the Government's attention to what they believe is new evidence which would affect the current validity of a national policy statement. Were that to happen, the relevant Secretary of State would then decide whether the evidence was both new and so significant that it warranted revisions to national policy. The proposer of the new evidence would be informed of the Secretary of State's decision. This would ensure that inquiries can focus on the specific and local impacts of individual applications, against the background of a clear assessment of what is in the national interest. This, in turn, should result in more focused and efficient inquiry processes."
Statutory Framework
"In deciding when to review a national policy statement the Secretary of State must consider whether—
(a) since the time when the statement was first published or (if later) last reviewed, there has been a significant change in any circumstances on the basis of which any of the policy set out in the statement was decided,
(b) the change was not anticipated at that time, and
(c) if the change had been anticipated at that time, any of the policy set out in the statement would have been materially different."
Section 6(4) employs the same three criteria for reviews of part of a NPS.
"Under our constitution policy-making at the national level is the responsibility of democratically-elected governments and ministers accountable to Parliament. As Lord Ho?mann said in R (Alconbury Developments Ltd) v Secretary of State for the Environment, Transport and the Regions [2003] 2 AC 295, paras 69 and 74: "It does not involve deciding between the rights or interests of particular persons. It is the exercise of a power delegated by the people as a whole to decide what the public interest requires."
"Planning and the development of land are matters which concern the community as a whole, not only the locality where the particular case arises. They involve wider social and economic interests, considerations which are properly to be subject to a central supervision. By means of a central authority some degree of coherence and consistency in the development of land can be secured."
and at [141]:-
"Once it is recognised that there should be a national planning policy under a central supervision, it is consistent with democratic principle that the responsibility for that work should lie on the shoulders of a minister answerable to Parliament."
"The Secretary of State must decide the application in accordance with any relevant national policy statement, except to the extent that one or more of subsections (4) to (8) applies."
It is important to note the words in s.104(3) "except to the extent that", recognising that an exception in subsections (4) to (8) may only have the effect of disapplying the obligation in s.104(3) as regards part of a NPS, or perhaps part of a project.
"This subsection applies if the Secretary of State is satisfied that deciding the application in accordance with any relevant national policy statement would lead to the Secretary of State being in breach of any duty imposed on the Secretary of State by or under any enactment."
"This subsection applies if the Secretary of State is satisfied that the adverse impact of the proposed development would outweigh its benefits."
The National Policy Statements on energy infrastructure
EN-1
"…the planning system is only one of a number of vehicles that helps to deliver Government energy and climate change policy. The role of the planning system is to provide a framework which permits the construction of whatever Government – and players in the market responding to rules, incentives or signals from Government – have identified as the types of infrastructure we need in the places where it is acceptable in planning terms."
"The Planning Act and any market reforms associated with the Electricity Market Reform project will complement each other and are consistent with the Government's established view that the development of new energy infrastructure is market-based. While the Government may choose to influence developers in one way or another to propose to build particular types of infrastructure, it remains a matter for the market to decide where and how to build, as market mechanisms will deliver the required infrastructure most efficiently. Against this background of possibly changing market structures, developers will still need development consent for each proposal. Whatever incentives, rules or other signals developers are responding to, the Government believes that the NPSs set out planning policies which both respect the principles of sustainable development and are capable of facilitating, for the foreseeable future, the consenting of energy infrastructure on the scale and of the kinds necessary to help us maintain safe, secure, affordable and increasingly low carbon supplies of energy."
"The UK must therefore reduce over time its dependence on fossil fuels, particularly unabated combustion. The Government plans to do this by improving energy efficiency and pursuing its objectives for renewables, nuclear power and carbon capture and storage. However some fossil fuels will still be needed during the transition to a low carbon economy."
"• increasing reliance on imports of oil and gas as North Sea reserves decline in a world where energy demand is rising and oil and gas production and supply is increasingly politicised; and
• the requirement for substantial and timely private sector investment over the next two decades in power stations, electricity networks and gas infrastructure."
"3.1.1 The UK needs all the types of energy infrastructure covered by this NPS in order to achieve energy security at the same time as dramatically reducing greenhouse gas emissions.
3.1.2 It is for industry to propose new energy infrastructure projects within the strategic framework set by Government. The Government does not consider it appropriate for planning policy to set targets for or limits on different technologies.
3.1.3 The IPC should therefore assess all applications for development consent for the types of infrastructure covered by the energy NPSs on the basis that the Government has demonstrated that there is a need for those types of infrastructure and that the scale and urgency of that need is as described for each of them in this Part.
3.1.4 The IPC should give substantial weight to the contribution which projects would make towards satisfying this need when considering applications for development consent under the Planning Act 2008."
The functions of the "IPC" (the Infrastructure Planning Commission) for determining applications for DCOs were transferred to the Secretary of State by the Localism Act 2011.
"This Part of the NPS explains why the Government considers that, without significant amounts of new large-scale energy infrastructure, the objectives of its energy and climate change policy cannot be fulfilled. However, as noted in Section 1.7, it will not be possible to develop the necessary amounts of such infrastructure without some significant residual adverse impacts. This Part also shows why the Government considers that the need for such infrastructure will often be urgent. The IPC should therefore give substantial weight to considerations of need. The weight which is attributed to considerations of need in any given case should be proportionate to the anticipated extent of a project's actual contribution to satisfying the need for a particular type of infrastructure."
"A failure to decarbonise and diversify our energy sources now could result in the UK becoming locked into a system of high carbon generation, which would make it very difficult and expensive to meet our 2050 carbon reduction target. We cannot afford for this to happen."
"The projections do not reflect a desired or preferred outcome for the Government in relation to the need for additional electricity generating capacity or the types of electricity generation required."
Paragraph 3.3.21 added that the projections helped to illustrate the scale of the challenge faced by the UK and the Government to understand how the market might respond.
"To minimise risks to energy security and resilience, the Government therefore believes it is prudent to plan for a minimum need of 59 GW of new electricity capability by 2025." (emphasis added)
"It is not the Government's intention in presenting the above figures to set targets or limits on any new generating infrastructure to be consented in accordance with the energy NPSs. It is not the IPC's role to deliver specific amounts of generating capacity for each technology type. The Government has other mechanisms to influence the current delivery of a secure, low carbon, affordable electricity mix. Indeed, the aim of the Electricity Market Reform project (see Part 2 of this NPS for further details) is to review the role of the variety of Government interventions within the electricity market."
"3.3.2 The Government needs to ensure sufficient electricity generating capacity is available to meet maximum peak demand, with a safety margin or spare capacity to accommodate unexpectedly high demand and to mitigate risks such as unexpected plant closures and extreme weather events. This is why there is currently around 85 GW of total generation capacity in the UK, whilst the average demand across a year is only for around half of this.
3.3.3 The larger the difference between available capacity and demand (i.e. the larger the safety margin), the more resilient the system will be in dealing with unexpected events, and consequently the lower the risk of a supply interruption. This helps to protect businesses and consumers, including vulnerable households, from rising and volatile prices and, eventually, from physical interruptions to supplies that might impact on essential services." (emphasis added)
"• fossil fuel generation can be brought on line quickly when there is high demand and shut down when demand is low, thus complementing generation from nuclear and the intermittent generation from renewables. However, until such time as fossil fuel generation can effectively operate with Carbon Capture and Storage (CCS), such power stations will not be low carbon (see Section 3.6).
• renewables offer a low carbon and proven (for example, onshore and offshore wind) fuel source, but many renewable technologies provide intermittent generation (see Section 3.4); and
• nuclear power is a proven technology that is able to provide continuous low carbon generation, which will help to reduce the UK's dependence on imports of fossil fuels (see Section 3.5). Whilst capable of responding to peaks and troughs in demand or supply, it is not as cost efficient to use nuclear power stations in this way when compared to fossil fuel generation."
"Within the strategic framework established by the Government it is for industry to propose the specific types of developments that they assess to be viable. This is the nature of a market-based energy system. The IPC should therefore act in accordance with the policy set out at in Section 3.1 when assessing proposals for new energy NSIPs."
"An increase in renewable electricity is essential to enable the UK to meet its commitments under the EU Renewable Energy Directive. It will also help improve our energy security by reducing our dependence on imported fossil fuels, decrease greenhouse gas emissions and provide economic opportunities. However, some renewable sources (such as wind, solar and tidal) are intermittent and cannot be adjusted to meet demand. As a result, the more renewable generating capacity we have the more generation capacity we will require overall, to provide back-up at times when the availability of intermittent renewable sources is low. If fossil fuel plant remains the most cost-effective means of providing such back-up, particularly at short notice, it is possible that even when the UK's electricity supply is almost entirely decarbonised we may still need fossil fuel power stations for short periods when renewable output is too low to meet demand, for example when there is little wind."
This paragraph draws an important distinction between the capacity of a power station and the periods for which it is operational.
"It is therefore likely that increasing reliance on renewables will mean that we need more total electricity capacity than we have now, with a larger proportion being built only or mainly to perform back-up functions."
"To hit this target, and to largely decarbonise the power sector by 2030, it is necessary to bring forward new renewable electricity generating projects as soon as possible. The need for new renewable electricity generation projects is therefore urgent."
"Fossil fuel power stations play a vital role in providing reliable electricity supplies: they can be operated flexibly in response to changes in supply and demand, and provide diversity in our energy mix. They will continue to play an important role in our energy mix as the UK makes the transition to a low carbon economy, and Government policy is that they must be constructed, and operate, in line with increasingly demanding climate change goals."
"Fossil fuel generating stations contribute to security of energy supply by using fuel from a variety of suppliers and operating flexibly. Gas will continue to play an important role in the electricity sector – providing vital flexibility to support an increasing amount of low-carbon generation and to maintain security of supply."
"Some of the new conventional generating capacity needed is likely to come from new fossil fuel generating capacity in order to maintain security of supply, and to provide flexible back-up for intermittent renewable energy from wind. The use of fossil fuels to generate electricity produces atmospheric emissions of carbon dioxide. The amount of carbon dioxide produced depends, amongst other things, on the type of fuel and the design and age of the power station. At present coal typically produces about twice as much carbon dioxide as gas, per unit of electricity generated. However, as explained further below, new technology offers the prospect of reducing the carbon dioxide emissions of both fuels to a level where, whilst retaining many of their existing advantages, they also can be regarded as low carbon energy sources."
This passage needs to be read together with paragraphs 3.3.12 (see paragraph 86 above) and 3.3.14 (see paragraph 60 above).
"As set out in paragraph 3.3.8 above, a number of fossil fuel generating stations will have to close by the end of 2015. Although this capacity may be replaced by new nuclear and renewable generating capacity in due course, it is clear that there must be some fossil fuel generating capacity to provide back-up for when generation from intermittent renewable generating capacity is low and to help with the transition to low carbon electricity generation. It is important that such fossil fuel generating capacity should become low carbon, through development of CCS, in line with carbon reduction targets. Therefore there is a need for CCR fossil fuel generating stations and the need for the CCS demonstration projects is urgent." (emphasis added)
"Given the level and urgency of need for infrastructure of the types covered by the energy NPSs set out in Part 3 of this NPS, the IPC should start with a presumption in favour of granting consent to applications for energy NSIPs. That presumption applies unless any more specific and relevant policies set out in the relevant NPSs clearly indicate that consent should be refused. The presumption is also subject to the provisions of the Planning Act 2008 referred to at paragraph 1.1.2 of this NPS."
EN-2
General Legal Principles
Interpretation of Policy
"The court's general approach to the interpretation of planning policy is well established and clear (see the decision of the Supreme Court in Tesco Stores Ltd. v Dundee City Council [2012] UKSC 13, in particular the judgment of Lord Reed at paragraphs 17 to 19). The same approach applies both to development plan policy and statements of government policy (see the judgment of Lord Carnwath in Suffolk Coastal District Council v Hopkins Homes Ltd. and Richborough Estates Partnership LLP v Cheshire East Borough Council [2017] UKSC 37, at paragraphs 22 to 26). Statements of policy are to be interpreted objectively in accordance with the language used, read in its proper context (see paragraph 18 of Lord Reed's judgment in Tesco Stores v Dundee City Council). The author of a planning policy is not free to interpret the policy so as to give it whatever meaning he might choose in a particular case. The interpretation of planning policy is, in the end, a matter for the court (see paragraph 18 of Lord Reed's judgment in Tesco v Dundee City Council). But the role of the court should not be overstated. Even when dispute arises over the interpretation of policy, it may not be decisive in the outcome of the proceedings. It is always important to distinguish issues of the interpretation of policy, which are appropriate for judicial analysis, from issues of planning judgment in the application of that policy, which are for the decision-maker, whose exercise of planning judgment is subject only to review on public law grounds (see paragraphs 24 to 26 of Lord Carnwath's judgment in Suffolk Coastal District Council). It is not suggested that those basic principles are inapplicable to the NPS – notwithstanding the particular statutory framework within which it was prepared and is to be used in decision-making."
The Planning Act 2008
Grounds 1 and 2
Ground 1
The examination
(i) Current models and projections, in particular BEIS's 2017 UEP, "should be taken into account in determining the need for fossil fuel generation in the proposed development" (para. 5.2.40);(ii) Gas generation capacity for which consents had already been granted exceeded the capacity projected in the 2010 and 2017 UEP projections. Although not all that capacity was guaranteed to be delivered, the realistic likelihood was that "some" would be built out, thereby calling into question the need for more fossil fuel development and, in particular, the proposal (para. 5.2.41 to 5.2.42);
(iii) The need for the proposed development was likely to be limited to "system inertia".[1] Plants such as Drax may sometimes be brought on, ahead of, or as a replacement to, renewable generation, to maintain an adequate level of system inertia. This amounted to "low level need and urgency" (para. 5.2.42). The need for the proposal was otherwise limited to providing flexibility to support renewable energy generation (para. 5.2.42 to 5.2.43).
"4.18 The ExA's views on the need for the Development and how this is considered in the planning balance have also been scrutinised by the Secretary of State. As set out above, paragraphs 3.1.3 of EN-1, and the presumption in favour of the Development already assume a general need for CCR fossil fuel generation. Furthermore, paragraph 3.1.4 of EN-1 states: "the [decision maker] should give substantial weight to the contribution which projects would make towards satisfying this need when considering applications for development consent". The ExA recommends that no weight should be given to the Development's contribution towards meeting this need within the overall planning balance. This is predicated on its view that EN-1 draws a distinction between the need for energy NSIPs in general and the need for any particular proposed development. The Secretary of State disagrees with this approach. The Secretary of State considers that applications for development consent for energy NSIPs for which a need has been identified by the NPS should be assessed on the basis that they will contribute towards meeting that need and that this contribution should be given significant weight.
4.19 The Secretary of State notes that paragraph 3.2.3 of EN-1 states that "the weight which is attributed to considerations of need in any given case should be proportionate to the anticipated extent of a project's actual contribution to satisfying the need for a particular type of infrastructure". The Secretary of State has, therefore, considered whether, in light of the ExA's findings, there is any reason why she should not attribute substantial weight to the Development's contribution to meeting the identified need for new CCR fossil fuel generation infrastructure in this case. In particular, she has considered the ExA's views on the changes in energy generation since the EN-1 was published in 2011, and the implications of current models and projections of future demand for gas-fired electricity generation and the evidence regarding the pipeline of consented gas-fired infrastructure which the ExA considered to be relevant [ER 5.2.40-43].
4.20 The Secretary of State's consideration of the ExA's position is that (i) whilst a number of other schemes may have planning consent, there is no guarantee that these will reach completion; (ii) paragraph 3.3.18 of EN-1 sets out that the Updated Energy and Emissions Projections (on which the ExA partially relies on to reach its conclusions on current levels of need) do not "reflect a desired or preferred outcome for the Government in relation to the need for additional generating or the types of electricity required"; and (iii) paragraph 3.1.2 of EN-1 explains that "[i]t is for industry to propose new energy infrastructure projects within the strategic framework set by Government. The Government does not consider it appropriate for planning policy to set target for or limits on different technologies". These points are reinforced elsewhere in EN-1, for example in paragraphs 2.2.4 and 2.2.19, which explain that the planning system will complement other commercial and market based mechanisms and rules, incentives and signals set by Government to deliver the types of infrastructure that are needed in the places where it is acceptable in planning terms – decisions on which consented energy schemes to build will therefore also be driven by these factors. In light of this, the Secretary of State does not accept that the ExA's findings on these issues should diminish the weight to be attributed to the Development's contribution towards meeting the identified need for CCR gas fired generation within the overall planning balance. The Secretary of State considers that this matter should be given substantial weight in accordance with paragraph 3.1.4 of EN-1. The Secretary of State's overall conclusions on the planning balance are set out at paragraphs 6.1 – 6.14 below.
6.6 The Secretary of State considers that the ExA's interpretation of the need case set out in the NPSs is incorrect. In taking the position it did on need and GHG emissions, the ExA arrived at a position where it recommended that consent for the Development should be refused. The Secretary of State considers that the NPSs support the case for new energy infrastructure in general and, in particular, the need for new CCR fossil fuel generation of the kind which the Development would provide. While acknowledging the GHG emissions from the Development, the generating capacity of the Development in either two- or one-unit configurations is a significant argument in its favour, with a maximum of 3.8GW possible if the Applicant builds out both gas-fired and battery storage units as proposed. Therefore, the Secretary of State considers, that the Development would contribute to meeting the identified need for CCR fossil fuel generation set out in the NPS and that substantial weight should be given to this in the planning balance." (original emphasis)
Analysis
Ground 2
(i) Changes in energy generation capacity since 2011;(ii) The implications of current models and projections of future demand for gas-fired electricity generation; and
(iii) The pipeline of consented gas-fired infrastructure.
Ground 3
"CO2 emissions are a significant adverse impact from some types of energy infrastructure which cannot be totally avoided (even with full deployment of CCS technology). However, given the characteristics of these and other technologies, as noted in Part 3 of this NPS, and the range of non-planning policies aimed at decarbonising electricity generation such as EU ETS (see Section 2.2 above), Government has determined that CO2 emissions are not reasons to prohibit the consenting of projects which use these technologies or to impose more restrictions on them in the planning policy framework than are set out in the energy NPSs (e.g. the CCR and, for coal, CCS requirements). Any ES on air emissions will include an assessment of CO2 emissions, but the policies set out in Section 2, including the EU ETS, apply to these emissions. The IPC does not, therefore need to assess individual applications in terms of carbon emissions against carbon budgets and this section does not address CO2 emissions or any Emissions Performance Standard that may apply to plant."
"CO2 emissions are a significant adverse impact of fossil fuel generating stations. Although an ES on air emissions will include an assessment of CO2 emissions, the policies set out in Section 2.2 of EN-1 will apply, including the EU ETS. The IPC does not, therefore need to assess individual applications in terms of carbon emissions against carbon budgets and this section does not address CO2 emissions or any Emissions Performance Standard that may apply to plant."
(i) the decarbonisation objective would be undermined by increasing gas-fired capacity where that already exceeds UEP forecasts;(ii) a significant increase in GHG emissions would have a significant adverse effect on climate change;
(iii) the development would have a significant adverse effect on landscape and visual receptors.
"4.16 This policy is also reflected in paragraph 2.5.2 of EN-2. It is the Secretary of State's view, therefore, that, while the significant adverse impact of the proposed Development on the amount of greenhouse gases that will be emitted to atmosphere is acknowledged, the policy set out in the relevant NPSs makes clear that this is not a matter that that should displace the presumption in favour of granting consent.
4.17 In light of this, the Secretary of State considers that the Development's adverse carbon impacts do not lead to the conclusion that the Development is not in accordance with the relevant NPSs or that they would be inconsistent with the CCA. The Secretary of State notes the need to consider these impacts within the overall planning balance to determine whether the exception test set out in section 104(7) of the 2008 Act applies in this case. The ExA considers that the Development will have significant adverse impacts in terms of GHG emissions which the Secretary of State accepts may weigh against it in the balance. However, the Secretary of State does not consider that the ExA was correct to find that these impacts, and the perceived conflict with NPS policy which they were found to give rise to, should carry determinative weight in the overall planning balance once the benefits of the project are properly considered, including in particular its contribution towards meeting need as explained below."
"In assessing the issue of GHG emissions from the Development and the ExA's conclusions in this matter, the Secretary of State notes that the Government's policy and legislative framework for delivering a net zero economy by 2050 does not preclude the development and operation of gas-fired generating stations in the intervening period. Therefore, while the policy in the NPS says GHG emissions from fossil fuel generating stations are accepted to be a significant adverse impact, the NPSs also say that the Secretary of State does not need to assess them against emissions reduction targets. Nor does the NPS state that GHG emissions are a reason to withhold the grant of consent for such projects. It is open to the Secretary of State to depart from the NPS policies and give greater weight to GHG emissions in the context of the Drax application but there is no compelling reason to do so in this instance."
Analysis
Ground 4
Analysis
Ground 5
"For the purposes of these Regulations, the CCR conditions are met in relation to a combustion plant, if, in respect of all of its expected emissions of CO2—
(a) suitable storage sites are available;
(b) it is technically and economically feasible to retrofit the plant with the equipment necessary to capture that CO2; and
(c) it is technically and economically feasible to transport such captured CO2 to the storage sites referred to in subparagraph (a)."
"Applicants should conduct a single economic assessment which encompasses retrofitting of capture equipment, CO2 transport and the storage of CO2. Applicants should provide evidence of reasonable scenarios, taking into account the cost of the capture technology and transport option chosen for the technical CCR assessments and the estimated costs of CO2 storage, which make operational CCS economically feasible for the proposed development." (emphasis added)
Analysis
"The preparation of an economic assessment will involve a wide range of assumptions on each of a number of factors, and Government recognises the inherent uncertainties about each of these factors. There can be no guarantee that an assessment which is carried out now will predict with complete accuracy either in what circumstances it will be feasible to fit CCS to a proposed power station or when those circumstances will arise, but it can indicate the circumstances which would need to be the case to allow operational CCS to be economically feasible during the lifetime of the proposed new station."
"In line with this principle, the courts have established that is possible to impose a condition prohibiting the implementation of a consent until that condition has been met – even where there are no reasonable prospects of the condition being met. However, in the context of the present application, the Applicant appears to believe that there is a reasonable prospect of CCS being economically and technically feasible "by the mid-2020s"."
"Moreover, it has made its assumption of economic feasibility entirely contingent on "the end price of electricity" without assessing the reasonableness of such assumptions about future prices. This is in contrast to the approach taken in the Applicant's CCR Statement where the Applicant has carried out a detailed assessment of the future economics, including wholesale electricity prices, to arrive at a set of justified conclusions about the economic feasibility of CCS."
Ground 6
"a provision requiring the monitoring of any significant adverse effects on the environment of proposed development, including any measures contained in a requirement imposed by an order granting development consent"
"When deciding whether to make an order granting development consent for EIA development the Secretary of State must—
(a) examine the environmental information;
(b) reach a reasoned conclusion on the significant effects of the proposed development on the environment, taking into account the examination referred to in sub-paragraph (a) and, where appropriate, any supplementary examination considered necessary;
(c) integrate that conclusion into the decision as to whether an order is to be granted; and
(d) if an order is to be made, consider whether it is appropriate to impose monitoring measures."
"When considering whether to impose a monitoring measure under paragraph (1)(d), the Secretary of State must—
(a) if monitoring is considered to be appropriate, consider whether to make provision for potential remedial action;
(b) take steps to ensure that the type of parameters to be monitored and the duration of the monitoring are proportionate to the nature, location and size of the proposed development and the significance of its effects on the environment; and
(c) consider, in order to avoid duplication of monitoring, whether any existing monitoring arrangements carried out in accordance with an obligation under the law of any part of the United Kingdom, other than under the Directive, are more appropriate than imposing a monitoring measure."
"The information is—
(a) information regarding the right to challenge the validity of the decision and the procedures for doing so; and
(b) if the decision is —
(i) to approve the application—
(aa) the reasoned conclusion of the Secretary of State or the relevant authority, as the case may be, on the significant effects of the development on the environment, taking into account the results of the examination referred to, in the case of an application for an order granting development consent in regulation 21, and in the case of a subsequent application, in regulation 25;
(bb) where relevant, any requirements to which the decision is subject which relate to the likely significant environmental effects of the development on the environment;
(cc) a description of any features of the development and any measures envisaged in order to avoid, prevent or reduce and, if possible, offset, likely significant adverse effects on the environment; and
(dd) any monitoring measures considered appropriate by the Secretary of State or relevant authority, as the case may be; or
(ii) ..…"
Analysis
"Member States should ensure that mitigation and compensation measures are implemented, and that appropriate procedures are determined regarding the monitoring of significant adverse effects on the environment resulting from the construction and operation of a project, inter alia, to identify unforeseen significant adverse effects, in order to be able to undertake appropriate remedial action."
"[Paragraph 150 of the Claimant's skeleton] introduces a separate and unparticularised assertion that "the Secretary of State failed lawfully to comply with …… Reg.30 of the EIA Regulations. The point made appears to be that the Secretary of State did not include a "reasoned conclusion … on the significant effects of the development on the environment" as required by Reg.30(2)(b)(i)(aa). That is a new ground outside the scope of the SFG that has nothing to do with monitoring and is baseless. The DL, read with the ExA, sets out detailed conclusions on the environmental impacts of the Drax Power proposal."
I agree.
Ground 7
Introduction
"5.8 The Secretary of State notes with regard to the amendment to the CCA that it does not alter the policy set out in the National Policy Statements which still form the basis for decision making under the Act. Section 2.2 of EN-1 explains how climate change and the UK's GHG emissions targets contained in the CCA have been taken into account in preparing the suite of Energy NPSs. As paragraph 2.2.6 of EN-1 makes clear, the relevant NPSs were drafted considering a variety of illustrative pathways, including some in which "electricity generation would need to be virtually [greenhouse gas] emission-free, given that we would expect some emissions from industrial and agricultural processes, transport and waste to persist." The policies contained in the relevant NPSs regarding the treatment of GHG emissions from energy infrastructure continue to have full effect.
5.9 The move to Net Zero is not in itself incompatible with the existing policy in that there are a range of potential pathways that will bring about a minimum 100% reduction in the UK's emissions. While the relevant NPSs do not preclude the granting of consent for developments which may give rise to emissions of GHGs provided that they comply with any relevant NPS policies or requirements which support decarbonisation of energy infrastructure (such as CCR requirements), potential pathways may rely in future on other infrastructure or mechanisms outside the planning regime offset or limit those emissions to help achieve Net Zero. Therefore, the Secretary of State does not consider that Net Zero currently justifies determining the application otherwise than in accordance with the relevant NPSs or attributing the Development's negative GHG emissions impacts any greater weight in the planning balance. In addition, like the ExA, the Secretary of State does not consider there to be any evidence that granting consent for the Development would in itself result in a direct breach of the duties enshrined in the CCA, given the scope of the targets contained in the CCA which apply across many different sectors of the economy. This remains the case following the move to Net Zero and therefore she does not consider that the exception in section 104(5) of the 2008 Act should apply in this case." (original emphasis)
(i) The policy in the NPSs had not been altered by the amendment to the CCA 2008 and still remained the basis for decision-making under the 2008 Act;
(ii) The UK's target of an 80% reduction in GHG emissions had been taken into account in the preparation of the energy NPSs;
(iii) The net zero target was not in itself incompatible with those policies, given that there was a range of potential pathways that will bring about a minimum 100% reduction in GHG by 2050;
(iv) Developments giving rise to GHG emissions are not precluded by the NPSs provided that they comply with any relevant NPS policy supporting decarbonisation of energy infrastructure, such as CCR requirements. Potential pathways may rely in future on other infrastructure or mechanisms outside the planning regime to offset or limit those emissions to help achieve net zero;
(v) Accordingly, the net zero target did not justify determining the application otherwise than in accordance with the NPSs or increasing the negative weight in the planning balance given to GHG emissions from the development;
(vi) Given that the targets in the CCA 2008 apply across many different sectors of the economy, there was no evidence that the proposed development would in itself result in a breach of that Act and so s.104(5) did not apply.
"In the case of section 104(5), notwithstanding the ExA's conclusions on the Development's adverse climate change impacts, it also found that there was no evidence to suggest that granting consent for the Development would in itself lead to the Secretary of State to be in breach of the duty set out in the CCA to ensure that the UK's target for 2050 is met. The Secretary of State agrees with this conclusion."
"In respect of the second submission, the Secretary of State does not consider that this provides any information that alters her conclusions set out in paragraphs 5.6 – 5.9 and 6.7 above."
Ground 7A
"(3) If after the completion of the Examining authority's examination, the Secretary of State-
(a) differs from the Examining authority on any matter of fact mentioned in, or appearing to the Secretary of State to be material to, a conclusion reached by the Examining authority; or
(b) takes into consideration any new evidence or new matter of fact, and is for that reason disposed to disagree with a recommendation made by the Examining authority, the Secretary of State shall not come to a decision which is at variance with that recommendation without —
(i) notifying all interested parties of the Secretary of State's disagreement and the reasons for it; and
(ii) giving them an opportunity of making representations in writing to the Secretary of State in respect of any new evidence or new matter of fact."
"there is no such thing as a 'technical breach of natural justice'… One should not find a breach of natural justice unless there has been substantial prejudice to the applicant as the result of the mistake or error that has been made."
and by Lord Wilberforce in Malloch v Aberdeen Corporation [1971] 1 WLR 1578, 1595 that:-
"A breach of procedure, whether called a failure of natural justice, or an essential administrative fault, cannot give him a remedy in the courts unless behind it there is something of substance which has been lost by the failure."
Ground 7B
Conclusion
Ground 8
Ground 9
Conclusion
Note 1 It is agreed that “system inertia” is necessary to address imbalances between electricity generation and variations in demand, resulting in changes to frequency on the network. The greater the system inertia, the slower the change in frequency and therefore the more time the network operator has to restore the balance between generation and demand. [Back]