STATUTORY INSTRUMENTS


2001 No. 1451

TRANSPORT AND WORKS, ENGLAND

TRANSPORT, ENGLAND

The Channel Tunnel Rail Link (Stratford Station and Subsidiary Works) Order 2001

  Made 1st March 2001 
  Coming into force 22nd March 2001 


ARRANGEMENT OF ARTICLES


PART I

PRELIMINARY
1. Citation and commencement
2. Interpretation

PART II

WORKS
3. Construction and maintenance of scheduled works
4. Stopping up of highways
5. Highway access
6. Temporary interference with waterways
7. Supplementary matters

PART III

ACQUISITION OF LAND
8. Power to acquire land
9. Application of the Compulsory Purchase Act 1965 and the Compulsory Purchase (Vesting Declarations) Act 1981
10. Acquisition of new rights
11. Compensation for injurious affection
12. Acquisition and use of subsoil
13. Time limit for powers of compulsory acquisition

PART IV

MISCELLANEOUS AND GENERAL
14. Certification of plans etc.
15. Application of provisions of principal Act
16. Transfer of functions of other railway operators relating to works
17. Transfer of functions under Order
18. Termination of development agreement

SCHEDULES

  Schedule 1 The scheduled works

  Schedule 2 Modifications relating to acquisition of new rights

  Schedule 3 Application of provisions of principal Act

Whereas an application has been made to the Secretary of State in accordance with the Transport and Works (Applications and Objections Procedure) Rules 1992[
1] made under section 6, 7 and 10 of the Transport and Works Act 1992[2] ("the 1992 Act"), for an Order under sections 1, 3 and 5 of the 1992 Act;

     And whereas each House of Parliament has passed a resolution approving the proposals to which the application relates pursuant to section 9 of the 1992 Act as modified by section 42 of the Channel Tunnel Rail Link Act 1996[3];

     And whereas the Secretary of State caused an inquiry to be held for the purposes of the application pursuant to section 11 of the 1992 Act;

     And whereas the Secretary of State, having considered the objections made and not withdrawn and the report of the person who held the inquiry, has determined to make an Order giving effect to the proposals comprised in the application with modifications which in his opinion do not make any substantial change in the proposals;

     And whereas notice of the Secretary of State's determination was published in the London Gazette on 23rd February 2001;

     Now, therefore, the Secretary of State, in exercise of the powers conferred on him by sections 1, 3 and 5 of, and paragraphs 1 to 5, 7 to 12 and 15 to 17 of Schedule 1 to, the 1992 Act and of all other powers enabling him in that behalf, hereby makes the following Order: - 



PART I

PRELIMINARY

Citation and commencement
     1. This Order may be cited as the Channel Tunnel Rail Link (Stratford Station and Subsidiary Works) Order 2001 and shall come into force on 22nd March 2001.

Interpretation
    
2.  - (1) In this Order - 

    (2) Unless the context otherwise requires, other expressions used in this Order and in the principal Act have the same meaning as in that Act.

    (3) References in this Order to rights over land include references to rights to do, or to place and maintain, anything in or on land or in the air-space over its surface.

    (4) All directions, distances, lengths and points stated in any description of works, powers or lands shall be construed as if the words "or thereabouts" were inserted after each such direction, distance, length and point.

    (5) Unless the context otherwise requires, any reference in this Order to a work identified by the number of the work shall be construed as a reference to the work of that number authorised by this Order.

    (6) References in this Order to points identified by letters, with or without numbers, shall be construed as references to the points so marked on the relevant deposited plan.



PART II

WORKS

Construction and maintenance of scheduled works
     3.  - (1) Union Railways may construct and maintain the scheduled works, being - 

    (2) Subject to paragraph (5) below, the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.

    (3) Union Railways may, for the purposes of or in connection with the scheduled works, do any of the following within the Order limits - 

    (4) Union Railways may within the Order limits - 

    (5) In constructing or maintaining any scheduled work, Union Railways may - 

    (6) Without prejudice to the generality of paragraphs (3) and (4) above, Union Railways may construct a pedestrian link at Stratford in the London Borough of Newham either - 

    (7) The power conferred by paragraph (3)(b) above does not include a power to extinguish any public right of way over any highway.

Stopping up of highways
    
4.  - (1) Union Railways may exercise the power conferred by paragraph 1(1) of Schedule 3 to the principal Act to stop up York Way between points L1 and L2 (which points are shown on the deposited plans) - 

    (2) Paragraph (1) above has effect without prejudice to article 15(2) below and subject to paragraph 1(3) of Schedule 3 to the principal Act.

    (3) In paragraph (1) above, "the relevant purposes" means purposes connected with the construction of the authorised works or the works authorised by Part I of the principal Act.

Highway access
    
5. Without prejudice to article 3(3)(b) above, Union Railways may, for the purposes of or in connection with the authorised works, form and lay out means of access at points AJ, AM and AN in the London Borough of Camden.

Temporary interference with waterways
    
6.  - (1) The powers conferred by this article shall be exercisable for the purpose of, or in connection with, the exercise of the powers conferred by this Order in relation to Work No. 1C.

    (2) Union Railways may - 

    (3) The power conferred by paragraph (2)(c) above shall be exercised in a way which secures - 

    (4) Union Railways shall not be liable for any loss suffered, or costs or expenses incurred, by any person as a direct or indirect result of any closure of a waterway in accordance with this paragraph.

Supplementary matters
    
7.  - (1) A deemed planning permission shall be treated as specific planning permission for the purposes of section 264(3)(a) of the Town and Country Planning Act 1990.

    (2) The authorised works shall be treated as comprised within the rail link for the purposes of sections 16 to 19, 21 and 22 of the principal Act to the extent that they would be so treated if the scheduled works were authorised by section 1(1) of that Act.



PART III

ACQUISITION OF LAND

Power to acquire land
    
8.  - (1) The Secretary of State may acquire compulsorily so much of the land shown on the deposited plans within the Order limits as may be required for or in connection with the authorised works.

    (2) Paragraph (1) above shall not authorise the compulsory acquisition of the land shown as the land numbered 2 in the London Borough of Newham on the deposited plans.

    (3) Nothing in paragraph (2) above shall prejudice in any way the power of the Secretary of State to acquire the said land pursuant to section 4 of the principal Act.

Application of the Compulsory Purchase Act 1965 and the Compulsory Purchase (Vesting Declarations) Act 1981
    
9.  - (1) Part I of the 1965 Act, so far as not inconsistent with this Order, shall apply to an acquisition of land under article 8 above as it applies to a compulsory purchase to which Schedule 1 to the Acquisition of Land Act 1981[8] applies and as if this Order were a compulsory purchase order under that Act.

    (2) In its application by virtue of paragraph (1) above, the 1965 Act shall have effect with the following modifications - 

    (3) The Compulsory Purchase (Vesting Declarations) Act 1981[9] shall apply as if this Order were a compulsory purchase order.

    (4) In its application by virtue of paragraph (3) above, the Compulsory Purchase (Vesting Declarations) Act 1981 shall have effect with the following modifications - 

Acquisition of new rights
     10.  - (1) The power conferred by article 8 above shall include, in relation to any land to which the power relates, power to create and acquire such easements or other rights over land as may be required as mentioned in that provision instead of acquiring the land itself.

    (2) Part I of the 1965 Act as applied to the acquisition of land under article 8 above, and the enactments relating to compensation for the compulsory purchase of land, shall apply to a compulsory acquisition by virtue of paragraph (1) above - 

    (3) In relation to land to which this paragraph applies, article 8 above, so far as relating to acquisition by virtue of paragraph (1) above, shall be treated as also authorising acquisition by a statutory utility in any case where the Secretary of State gives his consent in writing.

    (4) Paragraph (3) above applies to land within the Order limits which is or will be required for use in relocating any apparatus which it is expedient to divert or replace in consequence of the carrying out of the authorised works; and in that paragraph "statutory utility" means a licence holder within the meaning of Part I of the Electricity Act 1989[
10], a public gas transporter within the meaning of Part I of the Gas Act 1986[11], a water undertaker within the meaning of the Water Industry Act 1991[12], a sewerage undertaker within Part I of that Act and any local authority which is a relevant authority for the purposes of section 97 of that Act.

Compensation for injurious affection
     11. Section 10(1) of the 1965 Act (compensation for injurious affection) shall have effect, in relation to land injuriously affected by the execution of works under this Order, with the substitution for "acquiring authority have" of "Union Railways has".

Acquisition and use of subsoil
    
12.  - (1) The power conferred by article 8 above shall be exercisable as well in relation to the subsoil or under-surface only as in relation to the land as a whole.

    (2) Section 8(1) of the 1965 Act (limitation on right to require a person to sell part only of any house, building, manufactory or park or garden belonging to a house) shall not apply where the power conferred by article 8 above is exercised in relation to the subsoil or under-surface of land only.

    (3) Union Railways may enter upon, take and use for the purposes of the authorised works so much of the subsoil of any highway within the Order limits as shall be required for the purpose of the construction or maintenance of those works, without being required to acquire that subsoil or any interest therein.

Time limit for powers of compulsory acquisition
    
13. After the end of the period of 5 years beginning with the day on which this Order is made - 



PART IV

MISCELLANEOUS AND GENERAL

Certification of plans etc.
    
14. Union Railways shall, as soon as practicable after the making of this Order, submit one or more copies of the book of reference, the deposited sections and the deposited plans to the Secretary of State for certification that they are true copies of, respectively, the book of reference, the deposited sections and the deposited plans referred to in this Order; and a document so certified shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Application of provisions of principal Act
    
15.  - (1) Schedule 3, which amongst other matters applies provisions of the principal Act not applied by the preceding provisions of this Order, shall have effect.

    (2) So far as consistent with the provisions of this Order and the Transport and Works Act 1992 and so far as any person exercising the powers conferred by this Order is a nominated undertaker for the purposes of any provisions of Part I of the principal Act, this Order and the principal Act shall be construed as one.

    (3) Without prejudice to the generality of paragraph (2) above, in determining any application or request by Union Railways to any body for an approval or consent under the provisions of the principal Act (including those provisions as applied by this Order), it shall be competent for that body to have regard (so far as relevant) to the combined effect of the works authorised by this Order and the works authorised by the principal Act for the purposes of the construction of which Union Railways is the nominated undertaker.

Transfer of functions of other railway operators relating to works
    
16.  - (1) If the Secretary of State acquires any land for the purposes of this Order from a railway operator and there are situated on the land works authorised by statute, he (or Union Railways with the approval of the Secretary of State) may enter into an agreement with the railway operator for the transfer of any statutory power or duty relating to the works previously exercisable by the railway operator to him or Union Railways.

    (2) In paragraph (1) above, references to a railway operator are to a person who has the management for the time being of a network, station or light maintenance depot.

    (3) In this article, "light maintenance depot", "network" and "station" have the same meaning as in Part I of the Railways Act 1993[
13].

Transfer of functions under Order
     17.  - (1) Subject to paragraphs (2) and (3) below, Union Railways may enter into an agreement with any person ("the transferee") for the transfer of all or any of its undertaking under this Order, including all or any of the functions, powers or duties of Union Railways under this Order - 

    (2) The terms of any agreement made by virtue of paragraph (1) above shall, unless the transferee is the Secretary of State or a nominated undertaker for any purposes of any provisions of Part I of the principal Act, be subject to the approval of the Secretary of State.

    (3) Any agreement or undertaking entered into by Union Railways in connection with the promotion of this Order shall, so far as relevant to any functions, powers or duties under this Order exercisable by the transferee under an agreement made by virtue of paragraph (1) above, be binding on the transferee.

    (4) Where an agreement is made by virtue of paragraph (1) above, references to Union Railways in this Order (including references inserted or substituted by this Order in the principal Act or any other enactment) shall, to such extent and for such purposes as the agreement so provides, have effect as references to the transferee.

Termination of development agreement
    
18.  - (1) This article applies where the Secretary of State has entered into a development agreement for purposes connected with the construction or operation of the Channel Tunnel Rail Link, and that agreement has been terminated under provisions contained therein.

    (2) Where this article applies, the Secretary of State may by notice in writing transfer to himself or to a nominated undertaker within the meaning of section 34 of the principal Act any of the powers, functions, duties or liabilities of Union Railways under this Order, or of any person to whom Union Railways has transferred them.

    (3) Where he has transferred such a power, function, duty or liability to himself the Secretary of State may subsequently transfer it to such a nominated undertaker.

    (4) In exercising his powers under paragraphs (2) and (3) above, the Secretary of State may deal differently in respect of different parts of the authorised works.

    (5) Any notice under paragraph (2) above shall be given by the Secretary of State to Union Railways or to any person to whom Union Railways has transferred any of the powers, functions, duties or liabilities of Union Railways under this Order.

    (6) Paragraph (3) of article 17 above shall apply in relation to any transfer of functions, powers or duties to the Secretary of State or a nominated undertaker under this article as it applies in relation to any transfer of functions, powers or duties by virtue of an agreement under paragraph (1) of that article.



Signed by Authority of the Secretary of State for the Environment, Transport and the Regions


Ellis Harvey
Head of the Transport and Works Act Processing Unit, Department of the Environment, Transport and the Regions

1st March 2001



SCHEDULES


SCHEDULE 1
Articles 2(1) and 3


THE SCHEDULED WORKS


The works which Union Railways is authorised by article 3(1) above to construct and maintain are the following - 

     1. In the London Boroughs of Hackney and Newham - 

     2. In the London Boroughs of Camden and Islington - 



SCHEDULE 2
Article 10(2)(a)


MODIFICATIONS RELATING TO ACQUISITION OF NEW RIGHTS


     1. The modifications referred to in article 10(2)(a) above are as follows.

     2. For section 7 of the 1965 Act there shall be substituted - 

     3. In section 8 of that Act (provisions as to divided land) for subsection (1) there shall be substituted - 

     4. The following provisions of that Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land) namely - 

shall be so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be purchased compulsorily is vested absolutely in the acquiring authority.

     5. Section 11 of that Act (powers of entry) shall be so modified as to secure that, as from the date on which the acquiring authority have served notice to treat in respect of any right, they have power, exercisable in the like circumstances and subject to the like conditions, to enter for the purpose of exercising that right (which shall be deemed for this purpose to have been created on the date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on sheriff's warrant in the event of obstruction) of that Act shall be modified correspondingly.

     6. Section 20 of that Act (compensation for short term tenants) shall apply with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition of the land but taking into account only the extent (if any) of such interference with such interests as is actually caused, or likely to be caused, by the exercise of the right in question.

     7. Section 22 of that Act (protection of acquiring authority's possession of land where interest accidentally omitted from purchase) shall be so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.

     8. References in that Act to land are, in appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to - 

     9. In the Land Compensation Act 1973[14], for section 44 there shall be substituted - 

     10. For section 58 of that Act there shall be substituted - 



SCHEDULE 3
Article 15(1)


APPLICATION OF PROVISIONS OF PRINCIPAL ACT


Provisions of the principal Act applied

     1. The following provisions of the principal Act shall apply to the matters which are the subject of this Order on the general assumptions mentioned in paragraph 2 below and, where any special assumption is mentioned in paragraph 3 below for any such provision, on the special assumptions for it so mentioned - 

     2. The general assumptions are that references in the principal Act in whatever form (including references inserted or substituted by any provision of that Act in any other enactment) - 

     3.  - (1) The special assumptions are the assumptions set out in sub-paragraphs (2) to (10) below, and have effect for the purposes mentioned in paragraph 1 above.

    (2) In paragraph 5 of Schedule 3 to the principal Act, the reference to paragraph 1 or 4 of Schedule 2 to that Act shall be treated as a reference to article 3(3) or (4) above.

    (3) In paragraph 6(3) of Schedule 3 to the principal Act, the reference to paragraph 1(1) of that Schedule shall be treated as a reference to that paragraph 1(1) as applied by article 4(1) above.

    (4) In paragraph 14 of Schedule 3 to the principal Act, the reference to that Schedule shall be treated as a reference to this Order.

    (5) In paragraphs 11 and 13 of Schedule 4, paragraph 4 of Schedule 5 and paragraph 2 of Part VI of Schedule 15 to the principal Act, references to section 4(1) or, as the case may be, section 4 of that Act shall be treated as references to article 8 above.

    (6) Paragraph 8(1) of Schedule 10 to the principal Act shall be treated as including a reference to Work No. 1C authorised by this Order and the limits of deviation for that Work.

    (7) In paragraph 9 of Schedule 10 to the principal Act, the reference to approved arrangements shall be construed as a reference to any arrangements approved under a condition of a deemed planning permission so far as relating to the routing of vehicles or hours of working.

    (8) In paragraph 3(4) of Part I of Schedule 15 to the principal Act, the reference to deemed planning permission shall be treated as a reference to that expression as defined in article 2(1) above.

    (9) In paragraph 4 of Part IV of Schedule 15 to the principal Act, references to paragraph 1 of Schedule 3 to that Act shall be treated as references to that paragraph 1 as applied by article 4(1) above.

    (10) In paragraph 1(2) of Part VII of Schedule 15 to the principal Act, the reference to paragraph 11 of Schedule 2 to that Act shall be treated as a reference to article 6 above.

Ancillary Matters

     4.  - (1) Regulations made under section 29(4) of the principal Act shall have effect in relation to appeals referred to arbitration under subsection (7A) of section 60 or 61 of the Control of Pollution Act 1974[
15], as inserted by section 29(3) of the principal Act and applied by paragraph 1 above, as they have effect for appeals referred to arbitration under that subsection in relation to works carried out in exercise of the powers conferred by Part I of the principal Act.

    (2) Rules made under section 43(2) of the principal Act shall apply to an arbitration under this Order as they apply to an arbitration under Part I of the principal Act.

    (3) An order made under paragraph 11(2) of Schedule 10 to the principal Act shall apply to an application treated as granted under that provision as applied by paragraph 1 above as it applies to an application treated as granted under that paragraph 11(2) as enacted.

     5. Paragraphs 6 to 9 of Schedule 2 and the provisions of Schedule 9 to the principal Act as applied by paragraph 1 above shall only have effect (so far as concerns entry on land) so as to allow entry on land within the Order limits.

     6. Without prejudice to the generality of the general assumptions in paragraph 2 above, the references in section 7(1) of the principal Act to the coming into force of that Act shall be treated (so far as concerns the matters which are the subject of this Order) as references to the coming into force of this Order.

     7. Paragraph 3 of Schedule 3 to the principal Act shall apply to the stopping up authorised by article 4 above, treating references to the nominated undertaker as a reference to Union Railways and references to Part I of the principal Act as including a reference to this Order.



EXPLANATORY NOTE

(This note is not part of the Order)


This Order makes provision for certain works supplementary to the works provided for in the Channel Tunnel Rail Link Act 1996.

In particular, it makes provision for a station at Stratford in London for use in connection with the rail link, for a connection from the rail link to the North London Line to provide access to the West Coast Main Line, and for certain ancillary works, including a pedestrian link from the proposed new station at Stratford to the existing Stratford suburban station.

Copies of the deposited plans, sections and book of reference referred to in the Order may be inspected on weekdays during ordinary office hours at the Technical Library, Union Railways (North) Limited, Floor 1, 106 Tottenham Court Road, London W1P 9HF.


Notes:

[1] S.I. 1992/2902.back

[2] 1992 c. 42.back

[3] 1996 c. 61.back

[4] 1965 c. 56.back

[5] 1990 c. 8.back

[6] 1980 c. 66.back

[7] 1996 c. 61.back

[8] 1981 c. 67.back

[9] 1981 c. 66.back

[10] 1989 c. 29.back

[11] 1986 c. 44.back

[12] 1991 c. 56.back

[13] 1993 c. 43.back

[14] 1973 c. 26.back

[15] 1974 c. 40.back



ISBN 0 11 029328 2


 © Crown copyright 2001

Prepared 20 April 2001